Builders Log

This is a record of the, now completed, re-construction of Trulli Scrumptious

May 2007

Patio base constructed together with the outside bathroom

April 2007

Preparation for Patio area complete

Internal floor tiling completed

March 2007

Main Bedroom stone facade completed and preparation of the external area for patio and outside Bathroom

Preparation for Path around the building

Stone facade to Main bedroom

February 2007

End of February external view

Lounge ceiling before sand blasting and re-pointing

Lounge ceiling after sand blasting and re-pointing

Topping off the trulli cone

December 2006

The builder’s work is nearing completion, now the internal electrical and plumbing work can commence.  Also the doors and windows are currently being hand made.

View on the roof, showing the terracing

November 2006

View over the swimming pool

October 2005

The main entrance to Trulli Scrumptious, prior to re-furbishment

Another view from the pergola

Here you can see Trulli Scrumptious, prior to commencement of re-furbishment, viewed from the entrance drive